Case Studies
-
March 09, 2020
Upgrading the obsolete UPS (Uninterruptible Power Supply) System within the Walsall Council data centre and provisioning a new standby generator for the entire White Space has not only reinstated -
March 09, 2020
Installing a standby power solution to the fire life safety systems at The Stream Edge has provided the residents with additional back up to their existing fire protection. -
March 09, 2020
Installing a standby power solution to the passenger lift at Grantham House has provided the system with a reliable source of power. This will ensure that the lift is always able to return to the ground -
March 09, 2020
A standby power solution was installed in four tower blocks to keep the sprinkler system running and enhance their fire protection. -
March 09, 2020
Ocado took full occupation of their new Trident Place Head offices in March 2007, an estate they took over from a major telecoms provider. Within the new offices, Ocado inherited existing Data Centre space -
March 09, 2020
MIL Collections recently decided to protect their offices from power outage. The data stored at MIL Collections is very important as it relates to debt. It is a requirement to protect (or restore) this -
May 03, 2018
You can download the whole case study as a PDF here.
-
April 13, 2018
-
March 31, 2018
-
March 15, 2018
You can download a PDF version here.